Case Study

In this study we examine the impact of integrating a fleet of Enoda PRIME® Exchangers (“Prime Exchangers”) coordinated by Enoda ENSEMBLE™ into the Texas grid through the Business As Usual (“BAU”) case.

  • BAU operation of around 25,000 400kVA Prime Exchangers can allow for reduction of up to 3,855.8 tonnes of CO2 in the Regulation-Up market (“RegUp”) on June 21st, 2023. This fleet of 25,000 devices would have been sufficient on this day to completely saturate the regulation up market.

  • Such a fleet would have reduced carbon emissions of just one of the frequency and ancillary services, RegUp, by 54%, and would also enable Texans to benefit from Enoda’s ability to provide these services at lowest marginal cost.

Read more..

How To Solve a Problem Like Grid Stability
Paul Domjan Paul Domjan

How To Solve a Problem Like Grid Stability

Inertia has provided frequency stability since the introduction of synchronous generators in the first AC electricity networks. But as we increase the role of non-synchronous generation in the grid, we face a system-stability challenge.

Read More
A Stark Reality for the Energy Transition
Paul Domjan Paul Domjan

A Stark Reality for the Energy Transition

The ANC's historic defeat in South Africa, is in part, due to the socio-economic impact of having a dangerously unstable energy system. The rest of the world should take note.

Read More